AASHVIERA CONSTRUCTION
Engineering and execution of reinforced earth walls and retaining systems as critical structural components of bridge and highway infrastructure.
Reinforced Earth (RE) Walls and retaining systems are critical structural components in modern bridge and highway infrastructure, providing stability, constructability, and performance in approach embankments and grade-separated corridors.
At Aashviera Construction, reinforced earth systems are executed as an integrated part of bridge approaches, flyovers, ROBs, grade separators, and highway widening projects, where controlled earth retention and load distribution are essential for long-term performance.
Our approach focuses on the engineering behaviour of reinforced soil systems, interface with structural elements, drainage management, and constructability under site constraints such as limited right-of-way, staged construction, and live traffic.
By positioning reinforced earth walls within the broader context of bridge and highway engineering, we ensure alignment between design intent, execution methodology, and lifecycle performance.
The execution of reinforced earth walls requires controlled sequencing, material quality assurance, and coordination with adjacent bridge and highway works. Aashviera Construction follows a structured methodology aligned with approved designs and project specifications.
Execution is carried out with due consideration to live traffic, limited working space, drainage control, and interface with bridge foundations, abutments, and approach slabs.
Reinforced earth systems demand strict control over materials, workmanship, and execution practices. Aashviera Construction adopts structured quality and safety controls to ensure performance, durability, and compliance with project standards.
Backfill material, reinforcement elements, facing units, and drainage components are verified against approved specifications through testing, inspection, and documentation before and during execution.
Construction activities are monitored through stage-wise inspections, level checks, compaction control, and compliance with approved drawings and method statements.
Site operations are planned with emphasis on safe working practices, traffic management, equipment safety, and coordination within confined and live construction zones.
Quality and safety controls are integrated with overall project coordination to ensure seamless interface with bridge structures, approach slabs, and highway works.
Reinforced earth and retaining systems executed by Aashviera Construction are integrated within larger bridge and highway infrastructure projects, requiring close coordination with structural works, approach embankments, and traffic staging.
We work in collaboration with EPC contractors, consultants, and project authorities to deliver reinforced earth systems that align with overall project sequencing, safety requirements, and performance objectives.
Discuss Reinforced Earth System Requirements